See the whole picture
Describe the outcome you want
Explain how you want the home to work: more daylight, an open kitchen, another bedroom or better access. Distinguish priorities from preferences so the design team can discuss practical options.
Collect the current information
Bring together the latest existing and proposed drawings, photographs, relevant surveys and any previous structural information. Mark superseded drawings clearly so the design does not begin from an outdated layout.
Make responsibilities visible
List the architect, contractor and other advisers already involved. Ask who is responsible for applications, specialist design, temporary works, inspections and answering construction queries.
Agree the output and the programme
A useful quotation explains deliverables, assumptions, exclusions and dependencies. Timing should start from the point at which the required information and appointment arrangements are in place.
General information only; the project’s competent advisers must determine the applicable requirements.